Projects


Routine Level A o4 Siemens SGT-600 gas turbine by Siemens certified personnel, HG 4205, HG 4210, HG 4250, HG 4251, HG 4252, HG 4253, HG 4310, HG 5180, HG 5800, HG 5800 , HG 5850, HG 6010, HG 5261, HG 5220, HG 5085, HG 5051, HG 5950

Vibration and Ultrasonic Analysis of Rotating Equipment and Critical Machines of 9th South Pars Gas Refinery, Construction of Database, Survey of Equipment and Reporting as Early as possible and Issuing Repair Work Requirements including SGT-600 Gas Turbines, BFW Pumps, Seawater pumps, blowers …

Major inspection of a GE MS9001E gas turbine unit including dismantling and assembly of combustion chamber and its equipment, inspection of fuel nozzles, liner inspection, transition piece inspection, coupling inspection, check alignment, semi-upper turbine dismantling and assembly, internal turbine measurements, First stage nozzle dismantling, Segment inspection, Compressor fwd dismantling and assembly, IGV inspection, C1-C4 compressor blades examination, NDT compressor testing, Generator and exciter repair performances, Air Gap measurement, Bearing clearances measurement, Generator Rotor removal , Bearing Test, Seal Check, Exhaust Inspection, Auxiliary equipment Check, Generator and Exciter, Electromotors, Transformers, Switchgears, Batteries, Breakers, Relays, Instrument repair, Flame detector, Ignitor, Fire detector, switches, Thermocouples, Vibration sensors, gauges, ESDs , Control valves, Transmitters, etc. and assembling and preparing the unit for commissioning …

Major inspection of a GE MS9001E gas turbine unit including dismantling and assembly of combustion chamber and its equipment, inspection of fuel nozzles, liner inspection, transition piece inspection, coupling inspection, check alignment, semi-upper turbine dismantling and assembly, internal turbine measurements, First stage nozzle dismantling, Segment inspection, Compressor fwd dismantling and assembly, IGV inspection, C1-C4 compressor blades examination, NDT compressor testing, Generator and exciter repair performances, Air Gap measurement, Bearing clearances measurement, Generator Rotor removal , Bearing Test, Seal Check, Exhaust Inspection, Auxiliary equipment Check, Generator and Exciter, Electromotors, Transformers, Switchgears, Batteries, Breakers, Relays, Instrument repair, Flame detector, Ignitor, Fire detector, switches, Thermocouples, Vibration sensors, gauges, ESDs , Control valves, Transmitters, etc. and assembling and preparing the unit for commissioning …

Major Inspection of a Gas Turbine Unit GE (Nouvo Pignone) 5002 C/D, South Pars Gas Complex 3rd Refinery including refueling system dismantling, combustion chamber dismantling, coupling dismounting, element inspection, rotor position check, Inlet Casing dismantling, Compressor dismounting, Compressor dismounting Second stage aperture, first stage nozzle dismantling, compressor measurements, No. 2 bearing dismantling, No. 1 bearing dismantling and Thrust Bearing measurements, no. 3 and 4 bearing dismantling, NGV dismantling, 1st and 2nd and 3rd and 4th bearing nozzles, nozzle check And secondly, flood check, fuel nozzle check, liner check, Transition Piece check, Investigated Flame detector, assembly and measurement units preparing to launch …

Hot gas pass inspection of 2 Gas Turbine Unit GE (Nouvo Pignone) 5002 C/D, 2nd South Pars Gas Refinery Includes, Pre-shut down Unit Examination, Check Element, Fuel Route and Combustion Chamber Demonstration, Transition Piece Demonstration, Turbine Shell Demonstration, First Step Nozzle Demonstration, Second stage nozzle dismantling, shredding dismantling of segments, turbine internal measurement, and unit assembly and preparation for commissioning…

Major Inspection of a Gas Turbine Unit GE (Nouvo Pignone) 5002 C/D, South Pars Gas Complex 5th Refinery including refueling system dismantling, combustion chamber dismantling, coupling dismounting, element inspection, rotor position check, Inlet Casing dismantling, Compressor dismounting, Compressor dismounting Second stage aperture, first stage nozzle dismantling, compressor measurements, No. 2 bearing dismantling, No. 1 bearing dismantling and Thrust Bearing measurements, no. 3 and 4 bearing dismantling, NGV dismantling, 1st and 2nd and 3rd and 4th bearing nozzles, nozzle check And secondly, flood check, fuel nozzle check, liner check, Transition Piece check, Investigated Flame detector, assembly and measurement units preparing to launch …